| Structural Element | Unit | ex-VAT (€) | incl. VAT (€) | Notes |
|---|---|---|---|---|
| Raft/strip foundations | t | 65 | 78 | simple geometry |
| Monolithic walls | t | 80 | 96 | vertical placement |
| Columns | t | 95 | 114 | complex, tight spacing |
| Beams and lintels | t | 90 | 108 | longitudinal reinforcement |
| Floor slabs | t | 70 | 84 | two-layer mesh |
| Staircases | t | 110 | 132 | complex geometry |
| Non-standard structures | t | by quote | by quote | individual assessment |
| Formwork Type | Unit | ex-VAT (€) | incl. VAT (€) | Notes |
|---|---|---|---|---|
| Flat slab formwork | m² | 8.00 | 9.60 | incl. shoring and stripping |
| Wall and core formwork | m² | 12.00 | 14.40 | two-sided erection |
| Column formwork (rectangular) | pc | 35.00 | 42.00 | standard cross-section |
| Column formwork (circular) | pc | 48.00 | 57.60 | tubular, 30–60 cm dia. |
| Beam formwork | m | 18.00 | 21.60 | incl. bottom and sides |
| Foundation (strip) formwork | m | 9.00 | 10.80 | single-sided |
| Staircase formwork | flight | by quote | by quote | individual assessment |
* Labour only — formwork materials (panels, shoring, props) are costed separately or supplied by the client.
* For combined supply + labour quotes, contact us directly.
When combining rebar fabrication + placement + formwork, we offer a competitive integrated price. Contact us with your project drawings.
Before preparing a quote, we can visit the site. This allows us to give you a precise price with no hidden charges.
With two active construction crews, we can handle multiple projects simultaneously or accelerate single large projects.
Send us your project drawings or a brief description and we will prepare a detailed quote.